Monolithic Slab Guide

1st Inspection: Plumbing Under Slab

2nd Inspection: Mono Slab and Footing

3rd Inspection: Exterior Sheathing

  • Ensure installation meets the 2021 International Residential Code before scheduling inspection. Exterior sheathing needs to pass inspection before the water-resistant barrier (WRB) is installed.

4th Inspection: Complete Rough-in

5th Inspection: Insulation

6th Inspection: Shower Pan

  • Ensure installation meets the 2021 International Residential Code (required where shower floors and receptors are made watertight as per section P2709.2 of the IRC) before scheduling inspection.

7th Inspection: Temporary Power and Gas Release

8th Inspection: Water and Sewer Operating Permit

  • Ensure sewer and water lines are tied in, landscaping is finished, and meter boxes and clean-out caps are at grade and glued before scheduling inspection.

9th Inspection: Land Disturbance Final

  • Ensure that all necessary measures have been implemented to bring the site to an acceptable condition before scheduling the inspection. This includes confirming that landscaping is completed in accordance with approved plans, encompassing vegetation, soil stabilization, and ground cover. Additionally, verify that adjacent infrastructure, such as sidewalks, roads, and utilities, remains unaffected by the land disturbance. Finally, assess the overall condition of the site to ensure compliance with local zoning and land use regulations.

Final Inspection: Building Final All Trades

 

Note: There are documents which MUST be provided and can be found at Required Documents for New Single-Family Dwelling Permits. 

  1. Tega Cay South Carolina Homepage

Contact Us

  1. City Hall
    7725 Tega Cay Drive
    Tega Cay, SC 29708
    Phone: (803) 548-3512
    Fax: (803) 548-1400

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow